macro

Red Canyon Resources reports first Camp drill results: 232.3 m at 0.21% CuEq

Red Canyon Resources completed eight initial holes totalling 2,079 m at its Camp target, with a 232.3 m interval grading 0.21% CuEq, per TradingView.

the same feed is available to bots and dashboards through the api. connect the api →

what happened

Canadian explorer Red Canyon Resources has reported initial drilling results from its 100%-owned Camp target. The company completed eight holes with a combined length of 2,079 m.

The longest interval, 232.3 m, grades 0.21% copper equivalent (CuEq). A narrower section of 57.8 m returned 0.23% CuEq. TradingView, citing the press release Red Canyon distributed through TheNewswire, notes that no comparison with prior periods was provided.

Assays from 313 soil samples and 31 auger holes are still pending, with laboratory results expected before year-end.

why it matters

These are exploration-stage results, not confirmation of a defined resource or an economic deposit, so they are unlikely to move the copper market directly. Investors will watch follow-up drilling, whether the mineralization is continuous, and the pending laboratory data to judge whether the project merits further attention.

tags

instruments

CopperREDC

on polymarket

sources

  1. Red Canyon Resources Ltd. (REDC) Reports 232.3 M at 0.21% CuEq — TradingView, 18 November 2026 at 11:30 UTC

prepared by the newsmetry newsroom with ai assistance from the sources listed below. not investment advice.

alerts on your topics, the morning digest and the api — in your account.

get stories in real time ↗