MPK's Ouarigue interim resource rises to 2.077Moz
According to TradingView, MPK's interim Ouarigue MRE grew 57% to 2.077Moz, with drilling and study work still under way ahead of a 2027 feasibility study.
- published on Newsmetry
- original source published
the same feed is available to bots and dashboards through the api. connect the api →
what happened
MPK reported that the interim Ouarigue MRE rose 57% to 2.077Moz. The total includes a 970koz underground resource, while the open-pit portion is 97% Measured and Indicated.
According to TradingView, drilling and studies continue, with metallurgy optimisation under way and a feasibility study planned for 2027.
why it matters
For investors this is mainly a sign of a growing resource base at an early-stage project. Targets at depth and along the 37km corridor could add more ounces, but project economics will only become clear after the feasibility study. The story concerns a single company and has little effect on broader markets.
tags
instruments
sources
- MPK: Interim resource reaches 2.077Moz as drilling targets depth and the 37km corridor — TradingView, 5 November 2026 at 23:44 UTC
prepared by the newsmetry newsroom with ai assistance from the sources listed below. not investment advice.
alerts on your topics, the morning digest and the api — in your account.
get stories in real time ↗