energy

Bondada Engineering Receives Letter of Intent for 20 MW / 120 MWh Battery Storage EPC Package

Bondada Engineering has received a letter of intent for a 20 MW / 120 MWh vanadium redox flow battery storage EPC package, Reuters reported.

the public page opens no earlier than 15 minutes after we detect the story. approved stories may reach the api sooner. connect the api →

what happened

Bondada Engineering Ltd said it has received a letter of intent (LoI) for an engineering, procurement and construction (EPC) package covering a vanadium redox flow battery (VRFB) energy storage system rated at 20 MW and 120 MWh. The report was published by Reuters.

The item concerns a single storage project rather than a deal of large scale. A letter of intent does not by itself mean a signed contract, and the terms are not disclosed in the text.

why it matters

For the market this is a narrow company-level item within the grid storage segment. Long-duration VRFB storage draws attention from investors tracking grid battery projects, but the impact on the broader market is limited.

tags

instruments

Bondada Engineering

sources

  1. Bondada Engineering Receives LoI For 20 MW / 120 MWH VRFB BESS EPC Package — Reuters, 22 October 2026 at 08:36 UTC

prepared by the newsmetry newsroom with ai assistance from the sources listed below. not investment advice.

the public page opens no earlier than 15 minutes after we detect the story. approved stories may reach the api sooner.

get stories in real time ↗